Peel Harbour, Isle of Man

A project at Peel Harbour, Isle of Man, presented a unique engineering challenge: designing a robust combi-wall quay jetty to support a new footbridge and water retention scheme. Our maritime engineering specialists led the structural design.

We delivered full structural and maritime engineering services for the Peel Harbour combi-wall quay jetty. Our design team collaborated closely with the Isle of Man Department of Infrastructure to align on project goals, environmental considerations, and long-term performance indicators—especially for water retention and footbridge support.

In delivering this project, we combined technical structural engineering with maritime construction insights. Our scope included load assessments, detailed materials selection, and durability considerations to withstand marine conditions. Where temporary works were required, we devised safe and efficient methodologies to support on-site construction phases.

Our integrated engineering approach provided Peel Harbour with a sustainable and robust quay jetty solution. The project demonstrates our capability to deliver complex maritime structures that meet modern safety standards while preserving harbour integrity.

Client: Isle of Man Department of Infrastructure

Site: Peel Harbour

Project: Combi-wall quay jetty for footbridge and water retention scheme

Services: Maritime Engineering, Structural Engineering